Daimo app iconDaimo
SWMS & JSA · Queensland · built for tradies

A site-specific SWMS from a 30-second voice note.

Talk through the job, snap a few site photos, and Daimo writes the whole Safe Work Method Statement — QLD WHS-compliant and ready to sign, before you've finished your smoko.

Built for licensed QLD electricians. More trades on the way.

The Daimo app home screen
How it works

Three steps. No forms, no templates, no desk.

Daimo builds each document from a curated QLD safety library and the specifics of your site — not a generic template that fails on audit.

01

Talk it through

Describe the job and the site in your own words, and add a few photos. Tap the mic — no typing on a phone with gloves on.

02

Daimo drafts it

Site-specific hazards, the hierarchy of controls, a risk matrix and the 18 high-risk construction checks — drawn from a curated library, not guesswork.

03

Review & sign

Check it, capture worker sign-off on the screen, and export a branded PDF with your logo. Compliant paperwork in minutes.

A complete document

Not a checklist. A full, audit-ready SWMS.

Every Daimo document carries the sections a Queensland regulator expects to see — the same structure a safety consultant would charge you hundreds to produce.

👷‍♂️ Built for crews. On Pro and Pro Plus, documents sync across your whole company — the boss sets up the business once, and every worker's SWMS is ready and shared, with owner & admin controls.
Title block
PCBU, licence no, site, task, date
18 HRCW checks
high-risk construction categories
Risk matrix
likelihood × consequence rating
Job steps
hazards · controls · residual risk
PPE & controls
hierarchy of controls, per task
Legislation
WHS Act, ES Reg, AS/NZS 3000
Sign-off register
every worker, name · role · date
Your branding
logo & business on every page
Why site-specific matters

A generic template is a failed audit waiting to happen.

Under the WHS Regulation, a SWMS must be site-specific and prepared before high-risk construction work starts. Daimo drafts to the job in front of you — the switchboard, the pre-1990 asbestos risk, the roof access — so the document holds up.

Section 291
Prepared before high-risk construction work, site-specific, developed in consultation with workers.
You stay in control
Daimo drafts for review; you sign off. The PCBU remains responsible for accuracy under the WHS Act 2011 (QLD).
Works offline
Documents stay on your phone — viewable and shareable without signal, out on site.
Pricing

Plans that scale with your crew.

From the solo sparky to a ten-seat crew. Every plan includes a generous monthly document allowance, and you can cancel anytime. One account covers your whole business — you never buy a separate plan per worker.

Basic
$39/ month

or $390 a year — 2 months free

For the solo sparky running their own jobs.

  • 1 login
  • 30 documents / month
  • Voice-to-document generation
  • Branded PDF export with your logo
  • Offline access to every document
Choose Basic
Recommended Pro
$79/ month

or $790 a year — 2 months free

For a growing electrical business.

  • Up to 4 logins
  • 80 documents / month
  • Documents shared across the team
  • Owner & admin controls
  • Everything in Basic
Choose Pro
Pro Plus
$149/ month

or $1,490 a year — 2 months free

For established businesses and bigger crews.

  • Up to 10 logins
  • 200 documents / month
  • Everything in Pro
  • Priority support
Choose Pro Plus

Create your account here or in the app — then use the same email and your plan unlocks automatically across every device.